Typical lead time: 1-3 weeks
Typical duration: 5-10 working days
Full and part re-wires
Re-wiring is the heaviest piece of domestic electrical work, so we plan it carefully. We start with a walk-around to agree socket positions, switch heights, lighting layout and where the new consumer unit will live. The price is agreed in writing before any cable is run.
For most properties we work in two visits - first fix (cabling, back boxes, board position) before the plasterer, then second fix (faceplates, accessories, testing, certification) once the decorating is done. Plaster damage is minimised; we don't chase walls where surface trunking or floorboard lifts will do the job tidily.
What is included
- Walk-around survey and written quotation
- First-fix cabling to all rooms, including lighting, sockets, cooker, shower and dedicated circuits
- New consumer unit to 18th edition, RCBOs and surge protection where appropriate
- Second-fix accessories - sockets, switches, faceplates - to your specification
- Full inspection and testing on completion
- Electrical Installation Certificate, notified to building control via NICEIC
Part re-wires are quoted on the same basis. Common examples are kitchen circuits during a refit, lighting circuits during a redecoration, or replacing perished cabling found during an EICR.